Client: Wexford County Council
Construction phase: 13 April- 20 July 2018
Project details: Construction of 1.2 km of walkway along the river Barrow in New Ross. The walkway consisted of a 2 meter wide dense bitumen macadam footpath two wheelchair access ramps viewing and picnic areas streetlights street furniture and information signs on the local wildlife.
Client: Wexford County Council
Construction phase: 13 April- 20 July 2018
Project details: Construction of 1.2 km of walkway along the river Barrow in New Ross. The walkway consisted of a 2 meter wide dense bitumen macadam footpath two wheelchair access ramps viewing and picnic areas streetlights street furniture and information signs on the local wildlife.